Corneen



In August 2001, Airtricity opened its second wind farm in Ireland on the Slieve Rushen mountain, near Ballyconnell in County Cavan. The turbine blades rotate at 20rpm and produce at full capacity 3MW of power at 690V. The voltage is stepped up to 20kV in the transformers at the base of the tower and connected through a small substation on the farm to the distribution network.

PROJECT DETAILS .
Owner Airtricity
Developer Airtricity
Location Corneen, Ballyconnell, Co Cavan
Capacity 3 MW
Power Purchaser Airtricity Energy Supply
Commissioned August 2001
TECHNOLOGY .
Turbine Model GE Wind 1.5s
Turbine Rating 1.5 MW
Number of Turbines 2
Rotor Diameter 70.5m
Hub Height 64.5m
CONSTRUCTION .
Commenced March 2001
Completed July 2001
Total 4 months

OUTPUT DETAILS

.
No of homes powered approx 2,000/yr
CO2 savings approx 8,000 tonnes/yr