Dalswinton

Airtricity received full planning permission for the 30MW fifteen turbine Dalswinton wind farm in December 2006.  Construction took place over 2007 and the wind farm became operational in March 2008. 

The project is located approximately 10 miles north of Dumfries in Dumfries and Galloway.  

        
PROJECT DETAILS
Owner Airtricity
Developer Airtricity
Location Dalswinton, 10 miles north Dumfries, Scotland
Capacity 30MW
Grid Connection     Connected via 17km underground connection to Scottish Power's Dumfries substation
TECHNOLOGY
Turbine model REpower MM82
No. of turbines 15
Rotor diameter 82m
Hub height 80m
Blade rotation    8rpm - 19rpm
CONSTRUCTION
Contract Three contracts : turbine supply (REpower); Balance of Plant (Carillion); grid connection (United Utilities).  Aspects of the construction including fencing, dry stone work, plant hire, will be undertaken by locally based companies.
Duration     10 months
No. of landowners 1
OUTPUT DETAILS
No. of homes powered approx 18,000
CO2 savings over 60,000 tonnes/yr
Equivalent cars off road approx 14,000/yr